Buyer Guide · 6 min read

Right tonnage,
not maximum tonnage.

A bigger truck is not automatically a more productive one. The right tonnage is the one that matches your loader, your ramp and your cycle time.

Start with the loader, not the truck

An underground truck should be filled in a predictable number of loader passes — typically three to five buckets. If the truck is too large, the loader spends excessive time filling and the cycle loses efficiency. If it is too small, the fleet needs more units and more operators. Match truck capacity to the bucket volume of the LHD you already run.

Grade and ramp constraints

A loaded truck climbing a long ramp is the binding constraint in many mines. Check gradient, ramp length and surface condition, then confirm the truck can maintain an acceptable speed at gross weight on that grade. Brake performance downhill matters just as much. A truck that is fast on the flat but slow on the ramp reduces the whole fleet's output.

Tunnel dimensions and turning radius

Measure the clear width, height and turning radius at the tightest point — not at the portal. Underground trucks must fit with clearance for services, ventilation ducts and people. Turning radius is often the overlooked limit: a truck that fits the tunnel but cannot turn at the loading point is useless.

Cost of getting it wrong

Over-specifying raises purchase price, fuel use and tyre cost, and may require road upgrades. Under-specifying needs more trucks, more drivers and more traffic in confined tunnels. Build a simple cycle model: loader pass time, travel time loaded and empty, dump time, and queueing. Compare configurations on tonnes per shift, not on payload alone.

FAQ

How many loader passes should fill a truck?

Usually three to five. Fewer passes can mean an oversized truck; more than five usually wastes cycle time.

What limits truck size underground most often?

Ramp gradient and turning radius at the loading area are more common limits than the tunnel cross-section.

Is a larger fleet better than larger trucks?

Not necessarily. More units add labour and traffic congestion; model tonnes per shift before deciding.

Size your fleet properly

Send your loader bucket size, ramp gradient and tunnel dimensions. We will help you choose a truck tonnage that fits the cycle.

Request a fleet sizing review