Buyer Guide · 6 min read

More metres per shift,
same machine.

Advance rate is not just about drilling faster. Accuracy, flushing and rod discipline often deliver more metres per shift than raw power.

Plan the round before the rig moves

Drilling accuracy starts with the blast design. Mark the face clearly, check the centre line and confirm hole angles against the planned pattern. A few degrees of deviation at collaring compounds over hole depth and shows up as poor fragmentation and overbreak. Modern rigs with angle guidance help, but only if the operator trusts and uses the setup.

Collaring and rod handling

Start holes straight: collaring accuracy determines the whole hole. Use a stable setup, correct feed force and proper bit selection for the rock. Add rods smoothly and avoid striking the chuck with the rod — damaged threads are a common source of lost time. Keep rods straight; a bent rod drills an inaccurate hole and accelerates wear on the whole string.

Flushing and pressure

Insufficient flushing causes bit balling and slow penetration, especially in soft or wet ground. Check air or water pressure at the bit, not just at the machine gauge. Clean holes give faster drilling and better blast results. Watch for a sudden drop in penetration rate — it usually signals a dull bit or a flushing problem rather than a rock change.

Operator habits that compound

Record metres drilled, bit life and delay reasons per shift. Patterns appear within weeks: one operator losing time on rod changes, one bit type lasting longer in a specific formation. That data is more valuable than a specification sheet when improving advance rate, because it reflects your rock and your crew.

FAQ

What causes holes to deviate?

Poor collaring alignment, bent rods and excessive feed force are the main causes. Check all three before blaming the rock.

Why is penetration slow in wet ground?

Flushing is often inadequate. Check pressure at the bit and consider a different flushing medium or bit design.

How much can good rod handling improve output?

Significantly — thread damage and bent rods are among the most common sources of avoidable delay on underground rigs.

Discuss your drilling conditions

Tell us your rock type, face size and current metres per shift. We will suggest a rig configuration and operating approach.

Ask a drilling specialist