Buyer Guide · 6 min read
The parts you need
before you need them.
The cheapest spare part is the one already on site when a machine stops. A good spares strategy is about lead times, not warehouse size.
Classify by consequence, not price
A hose costing little can stop a loader just as effectively as a major component. Sort parts into three groups: machine-stoppers, wear items with predictable life, and long-lead items. Machine-stoppers — filters, hoses, seals, contactors, sensors — should always be on site. Wear items are stocked against a consumption rate. Long-lead castings are ordered on a schedule, not after a failure.
Use lead time to set stock levels
For each part, record supplier lead time and your average consumption. If a part takes six weeks to arrive and you use two a month, holding none is a calculated risk that will eventually fail. A simple reorder point — lead time multiplied by consumption plus a safety margin — prevents most stockouts without tying up excessive capital.
Track why parts fail
A part that fails repeatedly is rarely a parts problem. Contaminated hydraulic oil kills pumps; poor filtration kills engines; vibration kills electrical contacts. Log the reason for each replacement. If one component fails across several machines, investigate the cause before ordering more of the same part — otherwise you are funding a recurring problem.
Work with a supplier who stocks
Ask your equipment supplier which parts they hold regionally and what their dispatch time is. A supplier with a local spares inventory and a clear shipping commitment is worth more than a slightly lower unit price with an eight-week lead time. Confirm the part number matches your machine's serial range before ordering.
FAQ
How much should a mine hold in spares?
Base it on lead times and consumption rates, not a fixed percentage of equipment value. Start with machine-stoppers and expand from data.
What is the most commonly missed spare?
Hydraulic hoses and seals — inexpensive, varied, and capable of stopping a machine immediately.
Should we stock entire assemblies?
Only for long-lead items whose failure would halt production. Otherwise stock the wear components inside the assembly.